Full-Service Roofing | Altonah, UT
Everything we do is roofing. That focus means our Altonah crews install more roofs per year than companies that try to do siding, windows, and remodeling on the side.
Roof Replacement
Owens Corning Duration with SureNail technology or CertainTeed Landmark with NailTrak for reliable fastening in high-wind zones. Both meet ASTM D3462 and carry Class A fire ratings per UL 790. In Utah, we recommend the high-wind versions rated to ASTM D7158 Class H, which is 130 mph wind warranty. Full system install qualifies for Owens Corning Preferred Protection or CertainTeed SureStart Plus warranty.
Get a Free Quote โRoof Repair
Improper step flashing is the leading cause of roof leaks at wall-to-roof transitions. Step flashing needs to be woven between shingle courses with each piece extending 4" above the shingle exposure. We see Altonah homes where the last roofer used continuous L-flashing or just caulked the gap. That always fails. We tear it out and install proper step flashing with a kick-out diverter at the bottom per IRC R905.2.8.3.
Get a Free Quote โStorm Damage Repair
Storm damage is time-sensitive. Most insurance policies in Utah require claims within 12 months. We do a free inspection, document every damaged area with photos and measurements, and help you file the claim. If the adjuster approves it, we handle the repairs at the insurance-approved price.
Get a Free Quote โNew Roof Installation
New construction means we get to do everything right from scratch. No compromises, no working around someone else's mistakes. Ice and water shield where it belongs, properly lapped underlayment, correct nailing patterns, and ventilation sized to the space. That's a roof that lasts.
Get a Free Quote โMetal Roofing
Metal roof repairs are usually sealant failures at transitions, loose panels from improper installation, or rust spots on older galvanized systems. Our Altonah crew repairs all metal types. Not every issue needs a full replacement. Sometimes a sealant touch-up or panel re-securing solves it.
Get a Free Quote โShingle Roofing
We install every major shingle brand: GAF Timberline HDZ, Owens Corning Duration, CertainTeed Landmark, Atlas Pinnacle, Tamko Heritage, Malarkey Vista, and IKO Cambridge. Each brand has different warranty tiers, wind ratings, and price points. We help you compare without pushing one brand over another.
Get a Free Quote โFlat Roofing
TPO single-ply membrane is our most-installed flat roof system in Altonah. White reflective surface reduces cooling costs, hot-air welded seams are watertight, and 15-20 year manufacturer warranties are standard. Available in 45-mil, 60-mil, and 80-mil thickness.
Get a Free Quote โCommercial Roofing
TPO is our most-installed commercial membrane in Altonah. 60-mil thickness, hot-air welded seams, mechanically attached or fully adhered over polyiso insulation. The weld is stronger than the membrane. 15-20 year manufacturer warranties depending on system build-up.
Get a Free Quote โGutter Installation
Half-round copper gutters with round downspouts are the premium install for historic and high-end homes in Altonah. We solder every joint on-site with 50/50 tin-lead solder. Copper weathers to a green patina in Utah's climate over 5-7 years. For modern aluminum installs, we use Spectra Metals .027 gauge seamless stock in 25+ color options with Raytec hidden hangers rated to 25 lbs per linear foot of combined debris and ice load.
Get a Free Quote โRoof Inspection
Buying or selling a home in Altonah? A roof inspection from a licensed contractor beats whatever the home inspector saw from the driveway. We check every component, give you a remaining-life estimate, and flag anything the buyer or seller should know about.
Get a Free Quote โEmergency Roof Repair
Emergency tarping is step one. Stop the water. We secure heavy-duty poly tarps over the damaged area using 2x4 nailer boards attached to the deck. Once the immediate threat is contained, we schedule the permanent repair within 48-72 hours.
Get a Free Quote โSkylight Installation
VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.
Get a Free Quote โ